AI Weekly Malaysia

Back to items Summaries

ChargeSini deploys 120kW DC Charger at Atria Shopping Gallery in Damansara Jaya

ID
36215
Status
summarized
Published
16 Oct 2026, 7:10 PM
Fetched
16 Oct 2026, 7:51 PM
Provider
SoyaCincau
Category
malaysia-tech
Original URL
https://soyacincau.com/2026/10/16/chargesini-120kw-dc-charger-atria-shopping-gallery-damansara-jaya/
Source URL
https://soyacincau.com/feed/

Summary

Score
2.0
Created
16 Oct 2026, 7:51 PM
Tags
Audience
-

What happened

ChargeSini has deployed a 120kW DC charger at Atria Shopping Centre in Damansara Jaya, along Jalan SS 2/23, with two CCS2 nozzles across two parallel bays and a 200A connector. Because of the connector rating, 400V EVs cap out at roughly 80kW while 800V EVs can reach the full 120kW. Pricing is RM1.49 per kWh via the ChargeSini app, with slot reservation up to 30 minutes in advance and an idle fee of RM2.00 per 5 minutes starting 30 minutes after charging completes.

Why it matters

This is consumer EV charging infrastructure news, not something that changes what a developer, AI/ML learner, or SaaS founder builds or buys. The only concrete takeaway in the text is for EV drivers passing through Damansara Jaya: RM1.49/kWh, reservation up to 30 minutes ahead, and a RM2.00/5-minute idle fee that starts 30 minutes after your session ends, so plan to move the car. The article contains no API, pricing, or tooling detail that a software audience would act on.

Discussion angle

If you want to stretch this into a builder conversation, use it only as a prompt about charge-point operator economics in Malaysia: RM1.49/kWh plus idle fees as a revenue and utilisation model, and whether app-based reservations are the differentiator. Be clear that the article gives no data on utilisation, backend, or API access, so treat any conclusions as speculation.

Top