AI Weekly Malaysia

Back to items Summaries

ChargEV upgrades DC Charger to 240kW at R&R Gunung Semanggol Northbound

ID
49744
Status
summarized
Published
24 Nov 2026, 12:53 PM
Fetched
24 Nov 2026, 1:13 PM
Provider
SoyaCincau
Category
malaysia-tech
Original URL
https://soyacincau.com/2026/11/24/chargev-240kw-dc-charger-gunung-semanggol-rnr-north/
Source URL
https://soyacincau.com/feed/

Summary

Score
2.0
Created
24 Nov 2026, 1:14 PM
Tags
Audience
-

What happened

ChargEV upgraded its DC charger at R&R Gunung Semanggol Northbound (between Taiping and Penang) from 180kW to 240kW, using an Autel unit with two CCS2 nozzles — roughly a year after the same site went from 47kW to 180kW. With two EVs plugged in, each can still draw up to 120kW. Pricing is unchanged at RM1.60/kWh, activation works via ChargEV, JomCharge and Gentari Go, Auto Charge plug-and-charge is supported, and an idle fee of RM0.50/minute applies 20 minutes after a session ends.

Why it matters

This is consumer EV infrastructure news with no direct bearing on software, AI, data or SaaS work — the only transferable detail is the commercial design: one physical charger activated across three separate apps (ChargEV, JomCharge, Gentari Go) at a flat RM1.60/kWh, with a RM0.50/min idle fee starting 20 minutes after the session ends. If you build metered orbooked physical-resource products, that combination of flat usage pricing plus a timed penalty for occupying capacity after use is the one pattern worth noting; otherwise there is nothing here that changes what a builder should ship or decide.

Discussion angle

Quick gut-check for the room: is the flat RM1.60/kWh plus RM0.50/min-after-20-minutes idle fee a fair model for shared physical resources, or would per-minute pricing from the start be simpler to reason about and build against?

Top